PAST PROJECT

  • Specifie an alternate text for an image
    View Project
    LTSA CONDITION MONITORING DAN PM/PdM PLC (PROGRAMABLE LOGIC CONTROL) DAN MMS (MACHINERY MONITORING SYSTEM) 2 years





    Scope Of work:

    1. Visual Check (Routine, weekly/bi-weekly/monthly)
    2. LED Healty Status
    3. I/O Indication Status
    4. Troubleshooting (Hardware & Software)
    5. Database Collection
    6. Backup Configuration (Logic / HMI / System Config)
    7. Asset Monitoring System
  • Specifie an alternate text for an image
    View Project
    PEKERJAAN RETROFIT PANEL CONTROL SOOTBLOWER 011F101A DAN 011F101B DI AREA FOC II PT KILANG PERTAMINA INTERNASIONAL RU IV CILACAP




    SCOPE OF WORK :

    -Data Identification Work, Review of Existing Systems and Field Instruments.
    -Engineering & Assembly
    -Factory Acceptance Test (FAT)
    -Concrete Cutting, Excavation & Filling, andInstallation of the Instrument Cable Tray

  • Specifie an alternate text for an image
    View Project
    PT. BIOFARMA
    November 2023
    Expand Scada System Gedung 3 & 43
  • Specifie an alternate text for an image
    View Project
    Perbaikan CEMS FGC-1 Unit FCCU-CDL Sungai Gerong




    Scope Of Work :
    1. Engineering design Specification
    2. Reverse engineering from existing system
    3. Analyzer panel assembly & Install new
    4. analyzer panel & new sensor
    5. Auto Calbration
    6. Site installation, testing & commissioning
    7. CGA Test & RATA Test
    8. 2 years maintanence & spare part contract

  • Specifie an alternate text for an image
    View Project
    PT. PLN PUSHARLIS
    Juli 2023
    Pengadaan Material PLC Set M340





    Scope of Work:

    1. supply material
  • Specifie an alternate text for an image
    View Project
    Penggantian Indicator Lamp dan Switch di Local Panel 31K101ABC 32K101 dan 32K102ABC






    Scope Of Work:

    - Installation
    -Testing & Commisioning
  • Specifie an alternate text for an image
    View Project
    Upgrade PLC AIR DRIER Area Sungai Gerong






    Scope Of Work

    - Reverse engineering from existing system
    - Control panel assembly
    - HMI and PLC programming
    - Site installation, Install new Field Instrument
    testing & commissioning
    PLC : M580
  • Specifie an alternate text for an image
    View Project
    PENYEHATAN PANEL KONTROL UNIT EWTP DI OM PERTAMINA RU VI Balongan





    Scope Of Work

    - Excavation work & cable tray cover
    - Cable termination from field and SS to new JB
    - Design Engineering (Including Documentation)
    - Manufacturing (PLC & HMI Assembly Control and Programming)
    - FAT (Hardware check, panel layout, startup & Program I/O)
    - SAT and Commissioning (Turn on PLC & HMI control panel)


  • Specifie an alternate text for an image
    View Project
    UPGRADE SISTEM KONTROL DARI RELAY BASED KE PLC BASED PADA KOMPRESOR 024K-102, 240K-101, 240K-102 DI AREA LOC-II DAN LOC-III pada saat TA PT.KPI RU IV 2022



    SCOPE OF WORK
    - Data Identification Work, Review of Existing Systems and Field Instruments.
    - Engineering & Assembly
    - Factory Acceptance Test (FAT)
    - Concrete Cutting, Excavation & Filling, andInstallation of the Instrument Cable Tray
  • Specifie an alternate text for an image
    View Project
    PT.Biofarma
    JAN 2023
    SISTEM AUGMENTED REALITY PANEL LISTRIK





    Scope Of Work

    - Procurement
    - Equipment Installation Work
    - Installing and mapping the scope of the Augmented Reality system
    - Installing sensors and measuring
    - Perform equipment qualification, design, installation and operation
    - Conduct training



  • Specifie an alternate text for an image
    View Project
    UPGRADE ESD (Emergency Shutdown System) dari relay ke PLC Base area FOC I, LOC I dan UTL I pada saat TA PT.KPI RU IV 2022


    SCOPE OF WORK

    - Reverse Engineering from Existing system
    - Control Panel Assembly
    - EWS / OWS and PLC programming
    - Concrete Cutting, Excavation & Filling, and Installation of the Instrument Cable Tray.
    - Factory Acceptance Test (FAT)
    - Testing & Commisioning




  • Specifie an alternate text for an image
    View Project
    PT.Biofarma
    Oktober 2022
    Upgrade Panel ACTS 1000A PT.Biofarma
  • Specifie an alternate text for an image
    View Project
    UPGRADE PLC UNIT DEMIN EXISTING 55-A-101 A/B







    .- Engineering design Specification
    - Calculation List
    - Reverse engineering from existing system
    - Control panel assemblyHMI and PLC programming
    - Site installation, testing & commissioning
  • Specifie an alternate text for an image
    View Project
    Pertamina RU VI Balongan
    Februari 2022
    PENGGANTIAN KOMPONEN (HY& HIC) PANEL 12/14-K-101 DAN TERMINASI PSA PADA SAAT TA MAJOR 2022






    Engineering design Specification
    Install new Panel PLC PSA & Remove Panel PLC PSA existing
    Install new HIC & Remove existing HIC
    Install new field instrument & Remove existing field instrument in compressor area
  • Specifie an alternate text for an image
    View Project
    UPGRADE KONTROL SISTEM 12-A-501 MEMBRANE SEPARATOR PADA TA MAJOR 2022




    Engineering design Specification
    Calculation List
    Reverse engineering from existing system
    Control panel assembly & Install new Field Instrument HMI and PLC programming
    Site installation, testing & commissioning.
  • Specifie an alternate text for an image
    View Project
    Penyehatan CEMS (Continuous Emission Monitoring Systems) HVU-II CD&L





    Scope Of Work:
    1. Engineering design Specification
    2. Reverse engineering from existing system
    3. Analyzer panel assembly & Install new
    4. analyzer panel & new sensor
    5. Auto Calbration
    6. Site installation, testing & commissioning
    7. CGA Test & RATA Test


  • Specifie an alternate text for an image
    View Project
    Biofarma
    Desember 2021
    PEMASANGAN ECOSTRUXURE POWER MONITORING EXPERT (SISTEM AI SCADA)



    - Menyusun dokumen project management (schedule, plan, dsb)
    - Menyusun dokumen sistem arsitektur
    - Menyusun dokumen detail connection diagram
    - Menyusun dokumen operation manual
    Konfigurasi & programming Power Monitoring Expert
    Instalasi, Testing & Commisioning
  • Specifie an alternate text for an image
    View Project
    PERTAMINA RU VI Balongan
    November 2021
    PENGGANTIAN 13-HIC-304 PADA 13-K-101





    Dismantle HIC Existing
    Installation new HIC
    Commissioning new HIC
  • Specifie an alternate text for an image
    View Project
    PLN Pusharlis
    November 2021
    Pemasangan PLC & FO Lombok





    Engineering design Specification
    Calculation List
    Reverse engineering from existing system
    Control panel assembly
    HMI and PLC programming
    Site installation, testing & commissioning

    PLC Modicon M221 Schneider Electric
  • Specifie an alternate text for an image
    View Project
    UPGRADE CONTROL SOOT BLOWER FOC I LOC I







    Engineering design Specification
    Calculation List
    Reverse engineering from existing system
    Control panel assembly
    HMI and PLC programming
    Site installation, testing & commissioning.

    PLC M340 Schneider Electric
  • Specifie an alternate text for an image
    View Project
    Pertamina RU III Plaju
    September 2021
    PEMASANGAN PLC AIR DRYER PACKAGE 2025L PS 2 AREA UTILITIES







    Engineering design Specification
    Calculation List
    Reverse engineering from existing system
    Control panel assembly
    HMI and PLC programming
    Site installation, testing & commissioning.
  • Specifie an alternate text for an image
    View Project
    UPGRADE SISTEM KONTROL BMS LOC III






    Scope:

    1. Pengadaan Material
    2. Engineering & FAT (Factory Acceptance Test)
    3. Pekerjaan Instalasi
    4. Site Acceptance Test(SAT) dan Commisioning
    5. Training
  • Specifie an alternate text for an image
    View Project
    Upgrade HMI SIEMENS unit PSA (Pressure Swing Absorber)







    Scope:
    Procurement
    Reverse Engineering
    Reprogramming
    Installation & Commisiong on site
  • Specifie an alternate text for an image
    View Project
    PT.Nindya Karya
    Maret 2021
    Integrasi 35T-5 & 35T-6 Ke PLC & DCS







    Engineering (Office Base)
    - Re-Programming PLC
    - Re-Programming HMI
    - Programming DCS
    - Documentation
    Instalasi & Terminasi

    - Installation work on Existing PLC Panel
    - Pre-requisite untuk pekerjaan di Existing PLC
    - Installation work on Existing DCS

    Commissioning
    - Loop Check I/O
    - Function Test ESD from PLC
    - Function Test Control from DCS

  • Specifie an alternate text for an image
    View Project
    Retrofit Control System Pneumix 101-A-525B Area RFCC



    Engineering, Programming,Panel Fabrication,
    FAT ,site installation, and commissioning.
  • Specifie an alternate text for an image
    View Project
    Pertamina RU VI Balongan
    Desember 2020
    Penggantian Valve Di Unit Demin Plant (OSBL) PT Pertamina RU VI Balongan





    Panel Fabrication,Dismantle JB existing,Install new 3 unit JB, Dismantle Existing Valve 41 unit , Installation 41 unit New Valve ( 39 Butterfly Valve 2 Unit Diaphragm Valve) & commissioning
  • Specifie an alternate text for an image
    View Project
    PLC Telemetry
    Berfungsi untuk monitoring ketinggian air di bendungan PLTMH Poigar di Sulawesi Utara
  • Specifie an alternate text for an image
    View Project
    RETROFIT PLC AIR DRYER 58-D-10 Unit A & Unit B

    Pengantian 2 unit sistem kontrol Air Dryer unit A & unit B menggunakan PLC M340 Schneider dan field instrument Pressure Transmiter
    , Differtial Pressure Transmiter, Temperature Transmitter menggunakan Rosemount & Pressure switch menggunakan Aschroft
  • Specifie an alternate text for an image
    View Project
    Pertamina RU VI Balongan
    September 2020
    SPARING KLHK


    The term SPARING stands for
    SISTEM PEMANTAUAN SECARA OTOMATIK,TERUS MENERUS & DALAM JARINGAN BAGI
    USAHA DAN/ATAU KEGIATAN (SPARING)

    a) Project Schedule
    b) List of Materials supplied
    c) Technical Specification Data Sheet
    d) Brochure / Catalog
    e) Installation Plan / Job Implementation Method.
    f) Maintenance Strategy
    g) Operating / Instruction manual
    h) Spare parts list
    i) As-Built drawing
    j) Test Report or Performance Test at manufacture
    k) Warranty Certificate from Manufacture
    l) Job Progress Report
    m) Test Report on Site.
    n) Commissioning Report.
  • Specifie an alternate text for an image
    View Project
    PENGGANTIAN KONTROLER PNEUMIX INJECTION UNIT B

    Scope:
    o
    Engineering, Programming,Panel Fabrication,
    FAT ,site installation, and commissioning.
  • Specifie an alternate text for an image
    View Project
    Preventive Maintenence UPS di Solusi Bangun Guna Indonesia Narogong, Jawa Barat
  • Specifie an alternate text for an image
    View Project
    Pertamina RU VI Balongan
    Februari 2020
    PENGGANTIAN KONTROLER PNEUMIX INJECTION UNIT A

    Scope:
    o
    Engineering, Programming,Panel Fabrication,
    FAT ,site installation, and commissioning.
  • Specifie an alternate text for an image
    View Project
    Preventive Maintenence Battery Charger di PT.Solusi Bangun Guna - Narogong Jawa Barat
  • Specifie an alternate text for an image
    View Project
    Semen Merah Putih
    Januari 2020
    Preventive Maintenence DC System di Semen Merah Putih Bayah,Banten
  • Specifie an alternate text for an image
    View Project
    Biofarma
    Oktober 2019
    -Pemasangan Fan HVAC
  • Specifie an alternate text for an image
    View Project
    Upgrade Relay
    ke PLC, Penggantian Panel Control Monitoring Dengan Kelengkapanya pada Unit
    Kompresor 014 K 101, 84 K 101,86 K 101, dan 89K 201 pada Turn Around Project 2019 PT
    Pertamina RU IV CIlacap


    New PLC M580, New Field Instrument: Azbil , Ashcroft & Wika

    Supervision Vibration Monitoring System Bently Nevada

    3 unit new panel cabinet basement & 4 unit panel Local, Integrated
    LED/LCD with Keyboard & Touchpad, HMI

    New PLC system as controller,

    Scope:
    o
    Engineering design Specification
    o
    Calculation List
    o
    Reverse engineering from existing system.
    o
    Instalation,settings & Configure Field Instrument
    o
    3 unit Control panel assembly. & 4 unit Local Pressurized
  • Specifie an alternate text for an image
    View Project
    Penambahan
    Baru Relay Electric Earth Leakage Monitor 125 vdc pada area Paraxylene pada Turn
    Around Project 2019 PT Pertamina RU IV CIlacap


    New Earth Leakage Monitor 125 vdc,

    Scope:
    o
    Engineering design Specification
    o
    Calculation List
    o
    Reverse engineering from existing system.
    o
    1 unit Control panel assembly.
    o
    Drawing & Document
    o
    FAT, Site installation, testing & commissioning.

    ELM : THIIM
  • Specifie an alternate text for an image
    View Project
    PERTAMINA RU IV CILACAP
    September 2019
    Upgrade Emergency Shut Down ESD Dari System Relay Base
    Ke System PLC Base Di Kilang FOC II
    dan Kilang UTL II Turn Around Project 2019 PT Pertamina RU IV CIlacap

    New PLC TRICON CX 9 unit new 9 panel cabinet,
    Integrated LED/LCD with Keyboard & Touchpad,
    OWS/EWS

    New PLC system as controller,

    Scope:
    o
    Engineering design Specification
    o
    Calculation List
    o
    Reverse engineering from existing system.
    o
    Pulling Cable
    o
    Control panel assembly.
    o
    EWS/OWS and PLC programming.
    o
    Drawing & Document
  • Specifie an alternate text for an image
    View Project
    PERTAMINA RUIV CILACAP
    September 2019
    Burner Management System at Sulphur Recovery Unit 94K PT
    Pertamina RU
    IV CIlacap


    New Panel & HMI.

    New PLC as controller, redundant CPU, redundant
    power supply, and redundant communication.

    Scope:
    o
    Engineering design.
    o
    Reverse engineering from existing system.
    o
    Control panel assembly.
    o
    HMI and PLC programming.
    o
    Site installation, testing & commissioning.

    PLC : Schneider Quantum Safety Confidential Property of PT.
  • Specifie an alternate text for an image
    View Project
    PERTAMINA RUIV CILACAP
    Agustus 2019
    PENYEHATAN MASTER CONTROL PANEL DIESEL ENGINE GENERATOR
    PT
    Pertamina RU IV Cilacap


    New local HMI

    New PLC as controller,

    Scope:
    o
    Engineering design.
    o
    Reverse engineering from existing system.
    o
    Control panel assembly.
    o
    HMI and PLC programming.
    o
    Site installation, testing & commissioning.

    PLC : M 580
  • Specifie an alternate text for an image
    View Project
    Penggantian
    PLC Gun Monitor area 70 PT Pertamina RU IV
    System Control Upgrade and Modification

    Total retrofit of PLC in Gun Monitor Area 70
    Pertamina RU IV Cilacap

    Scope:
    o
    Engineering, programming, site installation, and
    commissioning.
    o
    PLC panel (Allen Bradley ControlLogix ,).

    PLC : Allen Bradley Control Logix
  • Specifie an alternate text for an image
    View Project
    PT.PERTAMINA RU IV CILACAP
    September-November 2019
    TURN AROUND PROJECT 2019

    -Penggantian relay ke PLC ESD FOCII & UTLII Turn Around Project 2019
    -Earth Leakage Monitor Turn Around Project 2019
    -Penggantian relay ke PLC Kompressor 84K 86K 89K 014K Turn Around Project 2019
    -Pemasangan PLC BMS 94K 2019
    -Penyehatan Relics
    -Penyehatan Diesel Engine Generator Turn Around Project 2019
    -Continuous Catalyst Regenerator (CCR) Lock Hopper Control System (LHCS) Upgrade
    -Perbaikan GUN Monitor area 70
    -Pekerjaan HMI IPAL
    -Condition Monitoring PT. Pertamina RU IV Cilacap
  • Specifie an alternate text for an image
    View Project
    Pekerjaan Penambahan HMI Secondary CRCS di OS - 17
    Upgrade PLC Polisher Unit 22-A-105
  • Specifie an alternate text for an image
    View Project
    Perbaikan dan Cloning Card Rectifier & Coil
  • Specifie an alternate text for an image
    View Project
    Battery Charger for PT. Holcim Tuban Plant
  • Specifie an alternate text for an image
    View Project
    PT. SARANA AGRA GEMILANG
    Maret-Juli 2018
    Modifikasi HMI SCADA pada Control Room
  • Specifie an alternate text for an image
    View Project
    Control System Upgrade
  • Specifie an alternate text for an image
    View Project
    Penggantian Baterry Pintu Rel Kereta Api DAOP 5
  • Specifie an alternate text for an image
    View Project
    Electrical Instalation
  • Specifie an alternate text for an image
    View Project
    Perbaikan Monitor LCD dan Site Survey PT. Perta Arun Gas
  • Specifie an alternate text for an image
    View Project
    Repair Electrical Devices
  • Specifie an alternate text for an image
    View Project
    Toka Tindung Electrical Power House Control System (EPHCS)
  • Specifie an alternate text for an image
    View Project
    Ship Unloader HMI/SCADA System
HEAD Office
Jl.Budi No.129, Cimahi Utara
Jawa Barat 40514, Indonesia.
Phone : (022) 2066 0357
Fax : (022) 8777 4265
Email : spmpsmail@sp-mps.com
  sales@sp-mps.com
BRANCH OFFICE
Jalan abimanyu no.143, Kb Manis Cilacap,
Jawa Tengah
Phone : ( 0282) 545797
Fax : (0282)540234