PERTAMINA RU IV CILACAP

Upgrade Relay
ke PLC, Penggantian Panel Control Monitoring Dengan Kelengkapanya pada Unit
Kompresor 014 K 101, 84 K 101,86 K 101, dan 89K 201 pada Turn Around Project 2019 PT
Pertamina RU IV CIlacap


New PLC M580, New Field Instrument: Azbil , Ashcroft & Wika

Supervision Vibration Monitoring System Bently Nevada

3 unit new panel cabinet basement & 4 unit panel Local, Integrated
LED/LCD with Keyboard & Touchpad, HMI

New PLC system as controller,

Scope:
o
Engineering design Specification
o
Calculation List
o
Reverse engineering from existing system.
o
Instalation,settings & Configure Field Instrument
o
3 unit Control panel assembly. & 4 unit Local Pressurized