PT.Kilang Pertamina Internasional RU IV Cilacap

UPGRADE ESD (Emergency Shutdown System) dari relay ke PLC Base area FOC I, LOC I dan UTL I pada saat TA PT.KPI RU IV 2022


SCOPE OF WORK

- Reverse Engineering from Existing system
- Control Panel Assembly
- EWS / OWS and PLC programming
- Concrete Cutting, Excavation & Filling, and Installation of the Instrument Cable Tray.
- Factory Acceptance Test (FAT)
- Testing & Commisioning